07/01/10
|
ND0924-R
|
Northern
Service Area Lightning Protection System Improvements
|
|
|
|
07/20/10
|
Warren Lightning
Rod Company
|
$95,649.00
|
|
06/28/10
07/13/10
07/19/10
|
AW1013
|
NWPCF
Operations & Maintenance Building and CWPCF Main Influent Pump Station
Roof Replacement
Addendum-No.1
Bid
Opening Date Change
Addendum-No.2
|



|
$75
per set
|
07/29/10
2PM
|
|
|
|
|
05/06/10
|
ND0924
|
Northern
Service Area Lightning Protection System Improvements
|
|
|
|
|
REJECTION OF BIDS
TO
BE READVERTISED
|
|
|
01/19/10
03/03/10
|
AW-IR-08
|
Area
Wide Interceptor Rehabilitation - NI-9, NI-14 and NI-16
ADDENDUM
No. 1
|
|
|
|
04/22/10
|
Northeast Remsco
|
$2,280,699.00
|
|
11/30/09
12/04/09
|
AW-SSR-08-R
|
Area
Wide Spread Spectrum Radio System
ADDENDUM
NO.1
|
|
|
|
12/22/09
|
Scalfo
Electric Inc.
|
$892,000.00
|
|
11/09/09
12/01/09
|
AW0805,
NI-16 Interceptor Rehabilitation
|
Work
to includes, but not necessarily limited to the relining of approximately
795 LF of 27-inch reinforced concrete pipe (RCP) and 4,695 LF of 36-inch
RCP. In addition, this work will
also include the rehabilitation of manholes, as required
ADDENDUM
NO. 1 ISSUED
|
|
|
|
12/22/09
|
En-Tech
Corp.
|
$1,121,310.00
|
|
08/27/09
|
SD0907-R
|
Relining
of approximately 4,100 linear feet of 8-inch ductile iron pipe and 4,100
linear feet of 12-inch ductile iron pipe force main, using cured-in-place
pipe intended for force main applications
|
|
|
|
11/24/09
|
B
and B Construction Company
|
$1,057,000.00
|
|
07/20/09
|
AW0206
|
Waste
Gas Burner Replacement
|
|
|
|
09/24/09
|
Quad
Construction Company
|
$618,100.00
|
|
07/13/09
07/20/09
07/29/09
08/05/09
|
CD0701
|
Septage
Receiving Facility Improvements
ADDENDUM
NO. 1
ADDENDUM
NO. 2
ADDENDUM
NO. 3
|
|
|
|
08/25/09
|
RD
Construction
|
$1,136,000.00
|
|
07/09/09
07/28/09
|
SD0907
|
Relining
of approximately 4,100 linear feet of 8-inch ductile iron pipe and 4,100 linear
feet of 12-inch ductile iron pipe force main, using cured-in-place pipe
intended for force main applications for Interceptor SPS-10 Beach Haven –
Nelson Avenue/SI-11 Force Mains
ADDENDUM
NO.1
|
|
|
|
|
REJECTION OF BIDS
TO
BE READVERTISED
|
|
|
07/06/09
07/31/09
|
AW0707
|
Area
Wide Ocean Outfall Anchor Repairs
ADDENDUM
NO. 1
|
|
|
|
08/25/09
|
Weeks
Marine
|
$2,901,000.00
|
|
06/17/09
07/02/09
07/06/09
07/07/09
|
AW-SSR-08
|
Area
Wide Spread Spectrum Radio System
ADDENDUM
NO. 1
ADDENDUM
NO. 2
ADDENDUM
NO. 3
|
|
|
|
|
REJECTION OF BIDS
TO
BE READVERTISED
|
|
|
06/22/09
07/02/09
|
ND0702
|
Concrete
Rehabilitation
ADDENDUM
NO. 1
|
|
|
|
07/21/09
|
Northeast
Remsco Construction Co.
|
$2,651,600
|
|
06/22/09
07/06/09
|
AW0902
|
Area
Wide Plant Scada Improvements
ADDENDUM
NO. 1
|
|
|
|
07/21/09
|
Scaflfo
Electric
|
$995,000.00
|
|
|
AW-FCR-08
|
Rehabilitation of Final Clarifiers
CWPCF-FC 2/3 and NWPCF FC-3
|
|
|
|
06/25/09
|
Allied Construction Group
|
$1,362,900.00
|
|
|
CWPCF-CBC-08
|
Contract CWPCF-CBC-08, Renovation And
Conversion Of The Existing Central Water Pollution Control Facility (CWPCF)
Chlorine Building To A Vehicle Maintenance Building. The Work Includes Site, Structural,
Architectural, HVAC, Plumbing, And Electrical.
|
|
|
|
06/25/09
|
R.D. Construction, Inc.
|
$1,384.500.00
|
|
|
AW-CIPP-08
|
Cured-in-Place Pipe for Interceptors
NI-14, CI-14, SI-11 Force Main and SI-11/SPS-6
|
|
|
|
05/28/09
|
Spiniello Companies
|
$1,785,415.00
|
|
|
SSA-PSI-08
|
Southern Service Area Pump Station
Improvements
|
|
|
|
03/26/09
|
Allied Construction Group
|
$1,413,000.00
|
|
|
CS0603
|
Construction Of A Pre-Engineered
Post-Frame Type Building
|
|
|
|
02/26/09
|
C. B. Structures, Inc.
|
$405,886.00
|
|
|
AW-IR-07
|
Rehabilitation of CSA & NSA Manholes
/ Interceptors and Siphon Chambers
|
|
|
|
04/23/09
|
Metra Industries
|
$2,657,000.00
|
|
|
CPS-7-9-12-RI-06
|
Replacement of gates and valves, concrete
rehabilitation, replacement of raw sewage pumps and controls, replacement
of comminutors, heating –ventilating improvements, improvements to service
water pump systems, and electrical work at three (3) OCUA Central Service
Area pump stations CPS-7, CPS-9, CPS-12
|
|
|
|
10/30/08
|
Tomar Construction, LLC
|
$6,928,000.00
|
|
|
ND0802
|
Installation of approximately 700 linear
feet of 6-inch diameter glass-lined ductile iron pipe at the Northern Water
Pollution Control Facility (NWPCF)
|
|
|
|
07/29/08
|
T&T Commonwealth Construction Co.,
Inc.
|
$278,002.00
|
|
|
AW-FCR-07
|
Area Wide Clarifier Rehabilitation for
Central FC-4 and Northern FC-5 & 6
|
|
|
|
06/26/08
|
R D
Construction, Inc.
|
$1,764,200.00
|
|
|
SWPCF-IFEB-07
|
SWPCF Influent Flow Equalization Basin
Construction
|
|
|
|
01/22/08
|
C. N. Lattimer & Son Constr. Co.,
Inc.
|
$4,484,000.00
|
|
|
AW-IR-06
|
NI-2, NI-6, CI-D6, CI-D7, SI-11&
SM-10B Interceptor Rehabilitation
|
|
|
|
10/25/07
|
Metra Industries
|
$3,140,800.00
|
|
|
AW-FCR-06
|
Area Wide Clarifier Rehabilitation
|
|
|
|
07/24/07
|
Municipal Maintenance
|
$2,306,525.00
|
|
|
CWPCF-HVAC-05-R
|
HVAC Improvements
|
|
|
|
06/28/07
|
Framan Mechanical
|
$5,895,000.00
|
|
|
CWPCF/NWPCF/SWPCF SCADA System Project
|
System Project
|
|
|
|
02/22/07
|
Scalfo Electric,
Inc.
|
$11,833,000.00
|
|
|
CPS-1-3-5-6-14-RI-05
|
Pump Station Improvements
|
|
|
|
02/22/07
|
Tomar Construction
LLC
|
$8,700,000.00
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|